top of page
Permanent Fence Boom for Ports and Water Intakes

Permanent Fence Boom for Ports and Water Intakes

At tanker berths, refinery jetties and water intakes, boom often stays in the water for months or years. A permanent fence boom is built for this: a stiff, heavy-duty curtain held upright by rigid floats on both sides, with a bottom tension member and ballast, made in materials that resist sunlight, abrasion and marine growth.

The Vens permanent fence boom is moored with anchors or fixed to piles and jetty structures, with sections and gates arranged so that vessels can still come and go. It keeps a ready barrier in place, so a spill at the berth is contained from the first minute.

  • Tanker berths, single point moorings and refinery jetties
  • Power plant and desalination water intakes
  • Marinas, harbours and dock entrances

What to send for a quotation

  • A site plan of the berth or intake, with water depth
  • The tidal range and the current
  • Vessel movements, and where gates or opening sections are needed
  • How the boom can be moored: anchors, piles or the jetty structure

Models and sizes

  • Height: 600 to 1,500 mm
  • Sections: 15 to 25 m
  • Fabric: heavy-duty PVC or PU-coated fabric, UV and marine-growth resistant
  • Floats: rigid floats on both sides
  • Tension member: bottom chain or cable, galvanised
  • Mooring: anchors, or fixed to piles and jetties

Options

  • Gates for vessel access
  • Pile sliders for tidal sites
  • Lights and marker buoys

Figures are typical and may change without notice. Actual performance depends on the liquid and the duty, on installation and use in line with the operation manual, and on site conditions; we confirm the figures for your duty in our offer.

Questions we are often asked

How is it different from boom kept in a store?
It stays in the water all the time, so it is built with rigid floats on both sides of a stiff curtain, materials that resist sunlight, abrasion and marine growth, and a bottom tension member and ballast that take the mooring loads.

Can vessels still pass?
Yes. Gates or sections that can be opened are built into the line where vessels and tugs need to pass. A damaged section can be changed without taking the whole line out.

Related equipment and reading

Vens has more than 10,000 installations. Every unit is designed by engineers who studied at MIT, Stanford, Cornell, the IITs, Arizona State University and the University of Cincinnati and have worked in the industries that use this equipment, so it is sized for the job, built in the right materials and designed to proper factors of safety.

    Rs 0,00Harga
    Kuantitas
    bottom of page