Containing Spills During Bunkering: the Ship-Side Boom
In ports, most oil spills are small and happen in the same place: between the ship and the quay, during bunkering or product transfer. An overfilled tank, a leaking hose or a coupling knocked loose puts oil into a narrow strip of water that is hard to reach once it spreads under the jetty.
The gap between hull and quay
Ordinary boom is hard to use there. The ship moves up and down with the tide and as it loads or unloads, and the distance to the quay changes. A boom laid loosely either jams or leaves a gap.
How a ship-side boom works
A ship-side bunkering boom is kept at the berth and placed upstream and downstream of the transfer point before the hoses are connected. Spring-loaded arms hold each end against the hull and the quay wall, and the boom follows the ship as it rises and falls. Oil spilled at the manifold stays in the enclosed strip, where it can be absorbed or skimmed.
Good practice
Place the boom before transfer starts, as part of the bunkering checklist.
Keep sorbents and a small skimmer next to the boom.
Check the arms and springs regularly, since the boom works hard against moving steel.
See the Vens ship-side bunkering boom and the permanent fence boom. See the full Vens oil spill response range and ASTM standards for oil skimmers.
Send your details through the enquiry form or message us on WhatsApp (+91 73974 98659), and we will size the equipment for your site.

_edited_edited.png)
.png)




Comments